BANTEN—MEDIA: Indonesia will launch 10 float units ( buoy) Tsunami Early Warning System ( TEWS) artificial in country starts January 2008.
" Next year will become busy year for us, because starts January 2008 there will be 20 buoy again is launched, 10 units among others made in Indonesia x'self," said Kepala Balai Teknologi Survei Kelautan BPPT Ridwan Djamaluddin in between Tsunami Drill to commemorate three years Acheh tsunami along the beach Selagu, Banten, Wednesday ( 26/12).
Germany renders 10 units buoy and United States one units. Then result of same job(activity of Indonesia-AS one units and one units again property of Norwegian attached by Malaysia. Total which will be launched to the last 2008 there are 23 units, he said.
Ridwan confess 23 units has not is ideal to take care of all Indonesia tsunami gristle coastal area, but have been enough optimal.
Buoy TEWS, he said, consisted of two bodyworks, that is float ( buoy) placed on the surface of sea and Ocean Bottom Unit ( OBU) put down in sea floor.
Sendor most important is Bottom Pressure Recorder ( BPR) a pressure gauge of sea floor in OBU which is sensitive to sea water coloum. Buoy TEWS is yoke to sea floor to apply ballast bound with steel chain and nylon that do not too far from OBU.
Its(the mode of action, their OBU increase of sea-waters as result of tsunami, data from OBU is sent to buoy to apply acoustic modem and buoy then sends data to station of receiver applies satellite.
In normal condition buoy sends data every one hours, but if happened tsunami buoy will send data every one minutes. Delivery time of data from OBU up to station of receiver is 1-2 minutes.
With earthquake characteristic in Indonesia sea territory, info from buoy expected to be acceptable within 5-15 minutes after earthquake, but depends on four p’s buoy to center earthquake. So public had enough time to evacuate.
Network buoy tsunami of vital importance and valuable because a real
useful to protect tens of million Indonesia publics in coastal area and hundreds of coastal area public in Indian Ocean, he/she said. ( Ant/OL-03)
Sabtu, 29 Desember 2007
PAN Has Not Discussed Presidential candidate Figure
PANGKALPINANG--MEDIA: Official Member Of DPP PAN has not whose discourse presidential candidate figure will ( presidential candidate) which will be proposed party is having symbol the sunrise in Pilpres 2009 coming.
" We will be awaiting result of legislative general election. If(When PAN obtains voice enough signifikan or 15 %, then candidate will be selected selectively," says Ketua DPP PAN Bidang Pemenangan Pemilu, Carapace Dryanto,di consorts Ketua DPP PAN Bidang Organisasi, Hakam Naja, in Pangkalpinang,
Saturday ( 29/12).
Official Member Of PAN hopes through proportional system applied by the party by denying serial number, cadre can struggle firm to reach for finite voice of acquirement of voice nationally can increase.
In choosing someone as presidential candidate, PAN specifies three criterions, like kapability, and value sells the candidate showed from track its(the record.
Candidate might possibly come from interen party and can also from outside party so long as fulfilling criterion is intended and is agreed official member. He tells, too early to call someone as presidential candidate figure from PAN. Even in the eyes of his(its, Head Leader PAN, SUTRISNO BACHIR has criterion required for presidential candidate, party has not will call candidate.
Now is done party is consolidation, strengthens bases is area and fights for aspiration of wishful public lived secure and prosperous. ( Ant/OL-06)
" We will be awaiting result of legislative general election. If(When PAN obtains voice enough signifikan or 15 %, then candidate will be selected selectively," says Ketua DPP PAN Bidang Pemenangan Pemilu, Carapace Dryanto,di consorts Ketua DPP PAN Bidang Organisasi, Hakam Naja, in Pangkalpinang,
Saturday ( 29/12).
Official Member Of PAN hopes through proportional system applied by the party by denying serial number, cadre can struggle firm to reach for finite voice of acquirement of voice nationally can increase.
In choosing someone as presidential candidate, PAN specifies three criterions, like kapability, and value sells the candidate showed from track its(the record.
Candidate might possibly come from interen party and can also from outside party so long as fulfilling criterion is intended and is agreed official member. He tells, too early to call someone as presidential candidate figure from PAN. Even in the eyes of his(its, Head Leader PAN, SUTRISNO BACHIR has criterion required for presidential candidate, party has not will call candidate.
Now is done party is consolidation, strengthens bases is area and fights for aspiration of wishful public lived secure and prosperous. ( Ant/OL-06)
Andi Mallarangeng Signs Democrat Admission
Writer: Mahfud
JAKARTA--MEDIA: Presidency Mouthpiece of Andi Mallarangeng signs will greet successful Democrat proposal to marry carries Susilo Bambang Yudhoyono to reach for seat President RI.
" a honour to struggle together moving forward country through Democrat," said Andi Mallarangeng, Saturday ( 29/12).
Chief DPP PARTAI DEMOKRAT ANAS URBANINGRUM before all express will offer Andi Mallarangeng to become official member of party. Andi calls Democrat as future party, middle party and modern party.
" Thus compatible for who only, especially for the rising generation which wish to build nation and state," he/she said.
But Andi refuses remark farther the problem of possibility annoyed it him(her performance as mouthpiece Kepresidenan if becomes official member of DPP Partai Demokrat. " We see is just later," his(its evasive. ( Fud/OL-06)
JAKARTA--MEDIA: Presidency Mouthpiece of Andi Mallarangeng signs will greet successful Democrat proposal to marry carries Susilo Bambang Yudhoyono to reach for seat President RI.
" a honour to struggle together moving forward country through Democrat," said Andi Mallarangeng, Saturday ( 29/12).
Chief DPP PARTAI DEMOKRAT ANAS URBANINGRUM before all express will offer Andi Mallarangeng to become official member of party. Andi calls Democrat as future party, middle party and modern party.
" Thus compatible for who only, especially for the rising generation which wish to build nation and state," he/she said.
But Andi refuses remark farther the problem of possibility annoyed it him(her performance as mouthpiece Kepresidenan if becomes official member of DPP Partai Demokrat. " We see is just later," his(its evasive. ( Fud/OL-06)
PABBSI Has Not Decided Follows Step Of PBSI
Writer: Thalatie Yani
JAKARTA--MEDIA: Association Head Leader of Weight lifting, Lifts Weight and Binaraga Seluruh Indonesia ( PABBSI) Adang Darajatun has not will take decision to prohibit atlet Olimpiade comes up in PON Kaltim 2008.
This thing is still being studied with all the line of official member of PABBSI and coach in the near time.
" This is being talked with coach etcetera, I have never taken decision x'self, because this its(the distance is near by will weigh," said Adang when met in Jakarta, Sabtu ( 29/12).
Before All Association Bulutangkis Seluruh Indonesia ( PBSI) has prohibited its(the atlet which will come up in Olimpiade act in PON. this PBSI Decision has got bless from Komite Olahraga Nasional ( KON).
According To Adang, time nearness the management of PON with Olimpiade 2008 of course makes PABBSI to consider impact which there will be to its(the atlet. Olympiad x'self will be passed off August 2008, while PON executed at July 2008.
" Now I didn't wish to comment formerly. Later we will study with coach. Hardly relating to ability, time exercised. Possibly later coach which will submit," said Adang.
In Olympiad 2008, Indonesia ascertains will come up in five branchs that is bulutangkis, weight lifting, archery, races bicycle and athletic. ( Rin/OL-06)
JAKARTA--MEDIA: Association Head Leader of Weight lifting, Lifts Weight and Binaraga Seluruh Indonesia ( PABBSI) Adang Darajatun has not will take decision to prohibit atlet Olimpiade comes up in PON Kaltim 2008.
This thing is still being studied with all the line of official member of PABBSI and coach in the near time.
" This is being talked with coach etcetera, I have never taken decision x'self, because this its(the distance is near by will weigh," said Adang when met in Jakarta, Sabtu ( 29/12).
Before All Association Bulutangkis Seluruh Indonesia ( PBSI) has prohibited its(the atlet which will come up in Olimpiade act in PON. this PBSI Decision has got bless from Komite Olahraga Nasional ( KON).
According To Adang, time nearness the management of PON with Olimpiade 2008 of course makes PABBSI to consider impact which there will be to its(the atlet. Olympiad x'self will be passed off August 2008, while PON executed at July 2008.
" Now I didn't wish to comment formerly. Later we will study with coach. Hardly relating to ability, time exercised. Possibly later coach which will submit," said Adang.
In Olympiad 2008, Indonesia ascertains will come up in five branchs that is bulutangkis, weight lifting, archery, races bicycle and athletic. ( Rin/OL-06)
DTK-J Reject Increase Of Rate Buswy
Writer: David Tobing
JAKARTA--MEDIA: Transportation Council Kota-Jakarta ( DTK-J) refuses Local Government plan Provinsi DKI Jakarta to boost up rate busway per 1 January 2008, from Rp3500 becomes Rp5000.
" Busway still having many weakness which must be improve;repaired. Mainly, fill of minimum service standard," explicitly Ketua DTK-J Edie Toet Hendratno, in Jakarta, Sabtu ( 29/12).
Member Of DTK-J Harya Setya Dillon adds decision to boost up rate busway without memperhitungan service standard of a minimum of is something that is is ethical not. " Comfort of consumer in busway, arrival frequency busway, must beforehand is corrected," explicitly him(her.
Besides, DTK-J also highlights problem of system integration of transportation in town Jakarta. Transportation system missal busway shall be able to be combined with transportation system KRL Blue-Line. Combination between the transportation systems will streamline government job(activity to lessen level of traffic jam.
Member Of other DTK-J, Bambang Pujantiyo expects combination of the system yields level of high service also.
" Especially, level of vehicle comfort of public should be able to be equivalent with level of vehicle comfort of person. If(when this condition created, more opting consumer gone up publik transport,” explicitly him(her. ( Dvd/OL-06)
JAKARTA--MEDIA: Transportation Council Kota-Jakarta ( DTK-J) refuses Local Government plan Provinsi DKI Jakarta to boost up rate busway per 1 January 2008, from Rp3500 becomes Rp5000.
" Busway still having many weakness which must be improve;repaired. Mainly, fill of minimum service standard," explicitly Ketua DTK-J Edie Toet Hendratno, in Jakarta, Sabtu ( 29/12).
Member Of DTK-J Harya Setya Dillon adds decision to boost up rate busway without memperhitungan service standard of a minimum of is something that is is ethical not. " Comfort of consumer in busway, arrival frequency busway, must beforehand is corrected," explicitly him(her.
Besides, DTK-J also highlights problem of system integration of transportation in town Jakarta. Transportation system missal busway shall be able to be combined with transportation system KRL Blue-Line. Combination between the transportation systems will streamline government job(activity to lessen level of traffic jam.
Member Of other DTK-J, Bambang Pujantiyo expects combination of the system yields level of high service also.
" Especially, level of vehicle comfort of public should be able to be equivalent with level of vehicle comfort of person. If(when this condition created, more opting consumer gone up publik transport,” explicitly him(her. ( Dvd/OL-06)
2008 the Government still Relying On Produce Of Chevron
2008 the Government still Relying On Produce Of Chevron
Between
TARGET OF 2008: Menkeu Sri Mulyani ( right) and The Minister of ESDM PURNOMO YUSGIANTORO when giving explanation of Evaluasi 2007 and Rencana 2008 Sectors ESDM in Jakarta, Jumat ( 28/12). the Government still relying on produce of PT CPI for target of produce of commodity exchange incorporated 2008.
JAKARTA—MEDIA: The Government still relying on produce of commodity exchange incorporated PT Chevron Pacific Indonesia ( CPI) to reach target of produce of commodity exchange incorporated according to APBN 2008 1,084 million barrels per day.
Deputy Of Gas and oil Pate;Upstream Executor Body ( BP MIGAS) Abdul Muin in between meeting The Minister of ESDM PURNOMO YUSGIANTORO with the my pemang importance in sector ESDM in Jakarta, Jumat ( 28/12) tells, governmental expects productive Chevron around 441000 barrels per day at 2008.
Number produce of Chevron reachs 40,7% from national target 1,084 million barrels per day.
" Chevron has the potency. The key, ready to add well and does treatment only," he/she said.
Besides Chevron, his(its continuation, governmental also hopes at produce of PT Pertamina ( Persero) and ConocoPhillips.
According to him(her, almost in all fields managed by Pertamina to have commodity exchange incorporated potency enough heights.
Concerning Casket Block, Muin tells, the block of course will start is productive at 2008.
" But, because its(the production in year-end, hence addition of create 2008 small relative. The year 2009, Casket will give contribution of production enough big," he/she said.
Before all, in meeting with Komisi VII DPR, BP MIGAS targets production 2008 planned to comes inter alia from Chevron 426300 barrels per day, Pertamina 135600 barrels per day, Conoco SNSB 59400 barrels per day, Inpex 47900 barrels per day, CNOOC 47900 barrels per day, and Total Indonesie 45000 barrels per day.
Hereinafter, Medco E&P Rimau 31800 barrels per day, BP ONWJ 31000 barrels per day, BOB CPP 28000 barrels per day, Pertamina Hulu-PPI/JOA-JOB 25100 barrels per day, Petrochina Jabung 23000 barrels per day, and JOC Pertamina-Mobil Cepu 17200 barrels per day.
Besides field which have been long enough is exist, BP MIGAS also will rely on produce of commodity exchange incorporated 2008 of at least 22 new fields.
10 oil fields among others is productive new field at 2008.
Ke-10 the field is North Duri, Kotabatak, Bekapai, Handil, Tunu 11A, Ivory Island and Sungai Kenawang, Fariz, Kuat, Lion, and Tangguh.
Temporary, 12 other fields has started initial production 2007, but will reach production with number of which is big enough at 2008.
Ke-12 the field is SW Betara, Tunu 12, TSB, UJUNG PANGKAH, Soka, Fariz, NEON Aja, Balam South, KE-32, KE-38, KE-39, and KE-54. ( Ant/OL-03)
| |
TARGET OF 2008: Menkeu Sri Mulyani ( right) and The Minister of ESDM PURNOMO YUSGIANTORO when giving explanation of Evaluasi 2007 and Rencana 2008 Sectors ESDM in Jakarta, Jumat ( 28/12). the Government still relying on produce of PT CPI for target of produce of commodity exchange incorporated 2008.
JAKARTA—MEDIA: The Government still relying on produce of commodity exchange incorporated PT Chevron Pacific Indonesia ( CPI) to reach target of produce of commodity exchange incorporated according to APBN 2008 1,084 million barrels per day.
Deputy Of Gas and oil Pate;Upstream Executor Body ( BP MIGAS) Abdul Muin in between meeting The Minister of ESDM PURNOMO YUSGIANTORO with the my pemang importance in sector ESDM in Jakarta, Jumat ( 28/12) tells, governmental expects productive Chevron around 441000 barrels per day at 2008.
Number produce of Chevron reachs 40,7% from national target 1,084 million barrels per day.
" Chevron has the potency. The key, ready to add well and does treatment only," he/she said.
Besides Chevron, his(its continuation, governmental also hopes at produce of PT Pertamina ( Persero) and ConocoPhillips.
According to him(her, almost in all fields managed by Pertamina to have commodity exchange incorporated potency enough heights.
Concerning Casket Block, Muin tells, the block of course will start is productive at 2008.
" But, because its(the production in year-end, hence addition of create 2008 small relative. The year 2009, Casket will give contribution of production enough big," he/she said.
Before all, in meeting with Komisi VII DPR, BP MIGAS targets production 2008 planned to comes inter alia from Chevron 426300 barrels per day, Pertamina 135600 barrels per day, Conoco SNSB 59400 barrels per day, Inpex 47900 barrels per day, CNOOC 47900 barrels per day, and Total Indonesie 45000 barrels per day.
Hereinafter, Medco E&P Rimau 31800 barrels per day, BP ONWJ 31000 barrels per day, BOB CPP 28000 barrels per day, Pertamina Hulu-PPI/JOA-JOB 25100 barrels per day, Petrochina Jabung 23000 barrels per day, and JOC Pertamina-Mobil Cepu 17200 barrels per day.
Besides field which have been long enough is exist, BP MIGAS also will rely on produce of commodity exchange incorporated 2008 of at least 22 new fields.
10 oil fields among others is productive new field at 2008.
Ke-10 the field is North Duri, Kotabatak, Bekapai, Handil, Tunu 11A, Ivory Island and Sungai Kenawang, Fariz, Kuat, Lion, and Tangguh.
Temporary, 12 other fields has started initial production 2007, but will reach production with number of which is big enough at 2008.
Ke-12 the field is SW Betara, Tunu 12, TSB, UJUNG PANGKAH, Soka, Fariz, NEON Aja, Balam South, KE-32, KE-38, KE-39, and KE-54. ( Ant/OL-03)
Langganan:
Postingan (Atom)